3/4 long view looking east. The foot of epdm on the left will be glued under tyvek and hardy-plank. |
Here's a look at the worst of the wrinkles. The manufacturer we purchased the epdm from stated this was not a problem. Even the case of standing water or puddling does not void the warranty an any respect. |
Below, a view of the space below the ends of the runners for draining water.....or rain. ...about 1/2". |
From outside on the scaffolds, the overhang at the bottom end of the slope...where the gutter will be. You can also see the steel strap hanging which the frame for the gutter will be welded. |
Showing the step up from inside. At the highest point about 4-1/4 inches. |